«back to the references survey

REFERENCES


  Aeronautical engineering production facility

 
Reference sheet Picture Project Contractor  Production sum TBE, net
Future Berlin - Line Maintenance Hangar at BER Lufthansa Technik AG 3.600.000 €
Airbus building 261
new construction and extensions
Airbus Operations GmbH 18.280.000 €
HAM 465 extension logistic center and outbuilding autoclave Hamburger Gesellschaft für Flughafenanlagen mbH 1.480.000 €
Final Assembly Line-China,
Paintshops
Airbus Operations GmbH 15.544.000 €
Final Assembly Line-China,
Final Phase Flightline Hangar
Airbus Operations GmbH 4.270.000 €
Airport Düsseldorf, hangar 7 Flughafen Düsseldorf GmbH 12.800.000 €
Lufthansa Technik Innovation@work Hamburger Gesellschaft für Flughafenanlagen mbH 2.000.000 €
Airbus building 104 Airbus Germany GmbH 700.000 €
interior assembly shops A380 interior assembly shops Airbus Germany GmbH 8.300.000 €
Airbus building 11c Airbus Germany GmbH 10.800.000 €
paintshops A380 Airbus paintshops A380 Airbus Germany GmbH 24.900.000 €
Airbus House 51 Airbus House 51 Airbus Germany GmbH 4.035.000 €
Airbus building 102 Airbus Germany GmbH 2.200.000 €
Airbus building 103 Airbus Germany GmbH 2.100.000 €

imprint